{"id":485424,"date":"2023-06-14T20:00:25","date_gmt":"2023-06-14T17:00:25","guid":{"rendered":"https:\/\/eba.com.ua\/?p=485424"},"modified":"2023-06-23T14:57:39","modified_gmt":"2023-06-23T11:57:39","slug":"na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv","status":"publish","type":"post","link":"https:\/\/eba.com.ua\/en\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/","title":{"rendered":"[:ua]\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432[:en]The construction of the new power plant on the site of the Kakhovska HPP will take 5 years[:]"},"content":{"rendered":"<p><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-485549 size-large\" src=\"https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-1024x656.png\" alt=\"\" width=\"1024\" height=\"656\" srcset=\"https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-1024x656.png 1024w, https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-100x64.png 100w, https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-300x192.png 300w, https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-768x492.png 768w, https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-650x417.png 650w, https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES-800x513.png 800w, https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES.png 1420w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>To overcome the immediate consequences of the Kakhovska Hydroelectric Power Plant explosion and prevent the reservoir from triggering, Ukrhydroenergo is working on a project for an upper dam. The dam, which will also serve as a bridge, is expected to be presented on July 10, and construction should begin immediately after the region&#8217;s de-occupation. Funding for the dam is planned to be sourced from international donors. This was announced by Ihor Syrota, the CEO of Ukrhydroenergo, during a meeting with companies from the European Business Association on June 14.<\/p>\n<p>The water level at the Kakhovka reservoir fluctuates between 7 and 8 meters. If the lower part of the dam remains undamaged, the water level may stabilize at approximately 6-7 meters. It would allow sufficient water intake at 12.7 meters after the floods. However, if the lower part of the dam is also damaged, the water level could decrease to 3 meters, corresponding to the riverbed. In such a case, restoring the necessary water level may take one to two years.<\/p>\n<p>It is crucial to understand that there will be no water supply from the Kakhovka reservoir to the Zaporizhzhia and Dnipropetrovsk regions until the next flood. The Kakhovka reservoir will not be replenished in the coming months. Therefore, alternative water supplies are being arranged for these regions, particularly for the cities of Kryvyi Rih and Nikopol, through other water pipelines for drinking and technical water. At the same time, Kherson may receive a portion of water from the river downstream.<\/p>\n<p>Businesses have already reported issues with technical water supply, particularly in Kryvyi Rih. The steel company ArcelorMittal Kryvyi Rih consumed 2.5 thousand cubic meters of technical water per hour before the Kakhovska HPP explosion. Currently, to conserve water, the water supply for production has been reduced by almost two-thirds to around 1 thousand cubic meters. As a result, the company has been forced to shut down particular units, including the complete halt of steel and rolling production. The situation is somewhat better in the mining department, where a closed water consumption cycle has been established, and reserves are expected to last 2-3 months.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p>After a recent recovery where production levels reached 30-40%, the company has now experienced a decline back to 15-20% due to the water problem. The catastrophe has created technical challenges and customer concerns, who hesitate to place new orders and monitor the situation. However, at ArcelorMittal, they assure that all current orders will be fulfilled without complications, and the management is seeking new approaches to adapt to the current situation and continue operations.<\/p>\n<p>The detonation of the Kakhovska HPP is likely to result in catastrophic environmental consequences and require considerable costs for the region&#8217;s restoration. However, analysts at Dragon Capital believe that the immediate negative impact on the Ukrainian economy will be moderate. Economic activity will be relatively unaffected due to several factors, including the shortage of technical and drinking water, reduced steel production, and a decline in exports. Export losses may amount to around 2%. However, there will be significant long-term losses concerning the restoration of infrastructure damages and the region&#8217;s agricultural potential.<\/p>\n<p>Specialists from Ukrhydroenergo assert with absolute certainty that the power plant was destroyed due to an internal underwater explosion caused by a substantial amount of explosives. No missile attack could have caused such destruction. The power plant was previously mined in September-October last year. Since then, only Russian military personnel have had access to it. Anton Herashchenko, an expert in national security, is also confident that the Russians destroyed the power plant. However, he believes that this event will not hinder the advancement of our armed forces and the liberation of territories.<\/p>\n<div>\n<p>We are grateful to our speakers &#8211;\u00a0<strong>Ihor Syrota<\/strong>, CEO of Ukrhydroenergo;\u00a0<strong>Mauro Longobardo<\/strong>, CEO of ArcelorMittal Kryvyi Rih;\u00a0<strong>Olena Bilan<\/strong>, Chief Economist of Dragon Capital; and\u00a0<strong>Anton Herashchenko<\/strong>, an expert in national security &#8211; for providing timely information and clarifying the consequences of this extraordinary incident.<\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>To overcome the immediate consequences of the Kakhovska Hydroelectric Power Plant explosion and prevent the reservoir from triggering, Ukrhydroenergo is working on a project for an upper dam. The dam, which will also serve as a bridge, is expected to be presented on July 10, and construction should begin immediately after the region&#8217;s de-occupation. Funding [&hellip;]<\/p>\n","protected":false},"author":4489,"featured_media":485549,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[118,4,5],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The construction of the new power plant on the site of the Kakhovska HPP will take 5 years - European Business Association<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The construction of the new power plant on the site of the Kakhovska HPP will take 5 years - European Business Association\" \/>\n<meta property=\"og:description\" content=\"To overcome the immediate consequences of the Kakhovska Hydroelectric Power Plant explosion and prevent the reservoir from triggering, Ukrhydroenergo is working on a project for an upper dam. The dam, which will also serve as a bridge, is expected to be presented on July 10, and construction should begin immediately after the region&#8217;s de-occupation. Funding [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/\" \/>\n<meta property=\"og:site_name\" content=\"European Business Association\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-14T17:00:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-23T11:57:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1420\" \/>\n\t<meta property=\"og:image:height\" content=\"910\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Katia Chaikovska\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katia Chaikovska\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/\",\"url\":\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/\",\"name\":\"[:ua]\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432[:en]The construction of the new power plant on the site of the Kakhovska HPP will take 5 years[:] - European Business Association\",\"isPartOf\":{\"@id\":\"https:\/\/eba.com.ua\/#website\"},\"datePublished\":\"2023-06-14T17:00:25+00:00\",\"dateModified\":\"2023-06-23T11:57:39+00:00\",\"author\":{\"@id\":\"https:\/\/eba.com.ua\/#\/schema\/person\/591c0ae4ce3e3490f70325dfb642ac52\"},\"breadcrumb\":{\"@id\":\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eba.com.ua\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432\",\"item\":{\"@type\":\"WebPage\",\"name\":\"[:ua]\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432[:en]The construction of the new power plant on the site of the Kakhovska HPP will take 5 years[:]\"}}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eba.com.ua\/#website\",\"url\":\"https:\/\/eba.com.ua\/\",\"name\":\"European Business Association\",\"description\":\"We are looking for proactive business leaders, who shape the investment climate of Ukraine and ready to supervise the work of the largest and the most influential business-community of Ukraine \u2013 European Business Association!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eba.com.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/eba.com.ua\/#\/schema\/person\/591c0ae4ce3e3490f70325dfb642ac52\",\"name\":\"Katia Chaikovska\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eba.com.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/59d91c5da250ea725c3c425585ff46fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/59d91c5da250ea725c3c425585ff46fb?s=96&d=mm&r=g\",\"caption\":\"Katia Chaikovska\"},\"url\":\"https:\/\/eba.com.ua\/en\/author\/katia-chaikovska-eba-com-ua\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"[:ua]\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432[:en]The construction of the new power plant on the site of the Kakhovska HPP will take 5 years[:] - European Business Association","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/","og_locale":"en_US","og_type":"article","og_title":"The construction of the new power plant on the site of the Kakhovska HPP will take 5 years - European Business Association","og_description":"To overcome the immediate consequences of the Kakhovska Hydroelectric Power Plant explosion and prevent the reservoir from triggering, Ukrhydroenergo is working on a project for an upper dam. The dam, which will also serve as a bridge, is expected to be presented on July 10, and construction should begin immediately after the region&#8217;s de-occupation. Funding [&hellip;]","og_url":"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/","og_site_name":"European Business Association","article_published_time":"2023-06-14T17:00:25+00:00","article_modified_time":"2023-06-23T11:57:39+00:00","og_image":[{"width":1420,"height":910,"url":"https:\/\/eba.com.ua\/wp-content\/uploads\/2023\/06\/GES.png","type":"image\/png"}],"author":"Katia Chaikovska","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Katia Chaikovska","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/","url":"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/","name":"[:ua]\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432[:en]The construction of the new power plant on the site of the Kakhovska HPP will take 5 years[:] - European Business Association","isPartOf":{"@id":"https:\/\/eba.com.ua\/#website"},"datePublished":"2023-06-14T17:00:25+00:00","dateModified":"2023-06-23T11:57:39+00:00","author":{"@id":"https:\/\/eba.com.ua\/#\/schema\/person\/591c0ae4ce3e3490f70325dfb642ac52"},"breadcrumb":{"@id":"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/eba.com.ua\/na-budivnytstvo-novoyi-stantsiyi-na-mistsi-kahovskoyi-ges-znadobytsya-5-rokiv\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eba.com.ua\/"},{"@type":"ListItem","position":2,"name":"\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432","item":{"@type":"WebPage","name":"[:ua]\u041d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u043e\u0432\u043e\u0457 \u0441\u0442\u0430\u043d\u0446\u0456\u0457 \u043d\u0430 \u043c\u0456\u0441\u0446\u0456 \u041a\u0430\u0445\u043e\u0432\u0441\u044c\u043a\u043e\u0457 \u0413\u0415\u0421 \u0437\u043d\u0430\u0434\u043e\u0431\u0438\u0442\u044c\u0441\u044f 5 \u0440\u043e\u043a\u0456\u0432[:en]The construction of the new power plant on the site of the Kakhovska HPP will take 5 years[:]"}}]},{"@type":"WebSite","@id":"https:\/\/eba.com.ua\/#website","url":"https:\/\/eba.com.ua\/","name":"European Business Association","description":"We are looking for proactive business leaders, who shape the investment climate of Ukraine and ready to supervise the work of the largest and the most influential business-community of Ukraine \u2013 European Business Association!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eba.com.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/eba.com.ua\/#\/schema\/person\/591c0ae4ce3e3490f70325dfb642ac52","name":"Katia Chaikovska","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eba.com.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/59d91c5da250ea725c3c425585ff46fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/59d91c5da250ea725c3c425585ff46fb?s=96&d=mm&r=g","caption":"Katia Chaikovska"},"url":"https:\/\/eba.com.ua\/en\/author\/katia-chaikovska-eba-com-ua\/"}]}},"_links":{"self":[{"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/posts\/485424"}],"collection":[{"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/users\/4489"}],"replies":[{"embeddable":true,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/comments?post=485424"}],"version-history":[{"count":4,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/posts\/485424\/revisions"}],"predecessor-version":[{"id":485580,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/posts\/485424\/revisions\/485580"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/media\/485549"}],"wp:attachment":[{"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/media?parent=485424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/categories?post=485424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eba.com.ua\/en\/wp-json\/wp\/v2\/tags?post=485424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}